Group Structure
MENU
Qinghai-Tibet Oil Pipeline Project
The equipment for this project is located at a high altitude area. Taikai has developed and successfully applied its own prefabricated cabin, auxiliary control system, and fire system for environmental factors.
Products supplied by Taikai:
◆ 10kV prefabricated substation
◆ AM6000 fire alarm system for auxiliary system
Key words:
Classification:
Power Consumption
Case Introduction
The equipment for this project is located at a high altitude area. Taikai has developed and successfully applied its own prefabricated cabin, auxiliary control system, and fire system for environmental factors.
Products supplied by Taikai:
◆ 10kV prefabricated substation
◆ AM6000 fire alarm system for auxiliary system
FAQ
undefined
If you are interested in this product, please fill in the following information and submit it to us, we will arrange experts to contact us as soon as possible!
Inquire about product solutions now
If you are interested in our products, please submit your request immediately and we will arrange professional staff to serve you.
Add:No.11526, Longtan Nan Road, Tai'an High-tech Industrial Development Zone
Service Hotline