Xinjiang Section of Golmud-Korla Railway
+
  • Xinjiang Section of Golmud-Korla Railway

Xinjiang Section of Golmud-Korla Railway

With a total length of 1213.7 kilometers, the main line of Geku Railway is an important part of the northwest railway network framework of China, and is praised as the "New Silk Road in Desert ". Taikai products contribute to strengthening the unity of ethnic regions and serving the "the Belt and Road" strategy.

 

Products supplied by Taikai:
◆ 110kV GIS
◆ 10kV telecontrol prefabricated substation for power of railway

Key words:

Classification:

Power Consumption

Case Introduction

With a total length of 1213.7 kilometers, the main line of Geku Railway is an important part of the northwest railway network framework of China, and is praised as the "New Silk Road in Desert ". Taikai products contribute to strengthening the unity of ethnic regions and serving the "the Belt and Road" strategy.

 

Products supplied by Taikai:
◆ 110kV GIS
◆ 10kV telecontrol prefabricated substation for power of railway


FAQ

undefined

undefined

If you are interested in this product, please fill in the following information and submit it to us, we will arrange experts to contact us as soon as possible!