Guodian Guigang Baihuashan Phase I Wind Power Project
Guigang Baihuashan Phase I Wind Power Project has a total installed capacity of 80 megawatts, with 32 sets of 2.5 megawatt wind turbines installed, which can supply 150000 ordinary households with electricity throughout the year, saving over 50000 tons of standard coal annually.
Products supplied by Taikai:
◆ 110kV fabricated substation
◆ 35kV wind power Fahrenheit substation
◆ 1 set of online monitoring CM3000
◆ 1 set of auxiliary control system AM6000
Key words:
Classification:
Power Generation
Case Introduction
Guigang Baihuashan Phase I Wind Power Project has a total installed capacity of 80 megawatts, with 32 sets of 2.5 megawatt wind turbines installed, which can supply 150000 ordinary households with electricity throughout the year, saving over 50000 tons of standard coal annually.
Products supplied by Taikai:
◆ 110kV fabricated substation
◆ 35kV wind power Fahrenheit substation
◆ 1 set of online monitoring CM3000
◆ 1 set of auxiliary control system AM6000
FAQ
undefined
If you are interested in this product, please fill in the following information and submit it to us, we will arrange experts to contact us as soon as possible!
Inquire about product solutions now
If you are interested in our products, please submit your request immediately and we will arrange professional staff to serve you.
Add:No.11526, Longtan Nan Road, Tai'an High-tech Industrial Development Zone
Service Hotline