ZBW-12/0.4 Electric Telecontrol Prefabricated Substation for Railway
+
  • ZBW-12/0.4 Electric Telecontrol Prefabricated Substation for Railway

ZBW-12/0.4 Electric Telecontrol Prefabricated Substation for Railway

The product is installed with two mutually independent power supply units which are self-closed and penetrated in a box, and are isolated from each other, safe and reliable, with complete functions, and less affected by external factors. The technical level is leading in China. The relationship between time and voltage can be used to realize the automatic removal of 10KV line faults, as well as the remote control, tele-signaling and telemetering of the signal power supply of substation by the master dispatching station. It is the main equipment in the railway automatic blocking and power transmission lines.
 

Key words:

Product Description

The product is installed with two mutually independent power supply units which are self-closed and penetrated in a box, and are isolated from each other, safe and reliable, with complete functions, and less affected by external factors. The technical level is leading in China. The relationship between time and voltage can be used to realize the automatic removal of 10KV line faults, as well as the remote control, tele-signaling and telemetering of the signal power supply of substation by the master dispatching station. It is the main equipment in the railway automatic blocking and power transmission lines.
 

  • 产品描述
    • Commodity name: ZBW-12/0.4 Electric Telecontrol Prefabricated Substation for Railway

    The product is installed with two mutually independent power supply units which are self-closed and penetrated in a box, and are isolated from each other, safe and reliable, with complete functions, and less affected by external factors. The technical level is leading in China. The relationship between time and voltage can be used to realize the automatic removal of 10KV line faults, as well as the remote control, tele-signaling and telemetering of the signal power supply of substation by the master dispatching station. It is the main equipment in the railway automatic blocking and power transmission lines.
     

ZBW-12/0.4 Electric Telecontrol Prefabricated Substation for Railway
+
  • ZBW-12/0.4 Electric Telecontrol Prefabricated Substation for Railway

ZBW-12/0.4 Electric Telecontrol Prefabricated Substation for Railway

The product is installed with two mutually independent power supply units which are self-closed and penetrated in a box, and are isolated from each other, safe and reliable, with complete functions, and less affected by external factors. The technical level is leading in China. The relationship between time and voltage can be used to realize the automatic removal of 10KV line faults, as well as the remote control, tele-signaling and telemetering of the signal power supply of substation by the master dispatching station. It is the main equipment in the railway automatic blocking and power transmission lines.
 

Key words:

Product Description

The product is installed with two mutually independent power supply units which are self-closed and penetrated in a box, and are isolated from each other, safe and reliable, with complete functions, and less affected by external factors. The technical level is leading in China. The relationship between time and voltage can be used to realize the automatic removal of 10KV line faults, as well as the remote control, tele-signaling and telemetering of the signal power supply of substation by the master dispatching station. It is the main equipment in the railway automatic blocking and power transmission lines.
 

  • 产品描述
    • Commodity name: ZBW-12/0.4 Electric Telecontrol Prefabricated Substation for Railway

    The product is installed with two mutually independent power supply units which are self-closed and penetrated in a box, and are isolated from each other, safe and reliable, with complete functions, and less affected by external factors. The technical level is leading in China. The relationship between time and voltage can be used to realize the automatic removal of 10KV line faults, as well as the remote control, tele-signaling and telemetering of the signal power supply of substation by the master dispatching station. It is the main equipment in the railway automatic blocking and power transmission lines.
     


FAQ

undefined

undefined

If you are interested in the product, please contact us and we will arrange professional staff to serve you.

Related Products

Related Products